Bexhill to Hastings Link Road – Ground Investigation
We were appointed as the specialist Ground Investigation Subcontractor for the new £89m, 5.5km long Hastings Link Road.
The intrusive works included up to 175 trial pits to depths up to 3m, 91 cable percussive boreholes (150mm diameter) to between 10 and 15m, with 25 of these extended by rotary drilling to depths of up to 20m, and 6 CPT holes.