Sutton
Southern Testing were contracted
to carry out a ground investigation and advise on foundation design for
two blocks of thirteen and sixteen storey buildings on Chalk. Due to the
high column loads, the designer initially assumed that piled foundations
would be required. However, the results from boreholes indicated that good
quality chalk was present from near ground level and that raft foundations
might be feasible.
read
more
Upminister, London
Ground investigation to provide factual information on foundation soil conditions and ground stiffness at a site where it was proposed to construct a wheel lathe and train cleaning facility involving a large reinforced concrete raft. Site works comprised trial pits, insitu plate bearing tests and insitu density tests and subgrade sampling.
Haywards Heath, West Sussex
Insitu plate bearing tests and factual reporting of results for a piling rig working platform.
Kings Cross, London (Crossrail)
Insitu plate bearing tests and factual reporting of results at the location of proposed crane out riggers.
Oxford Airport
Three phases of ground investigation have been undertaken to provide information on the construction thickness and underlying soil conditions of existing apron / pavement areas, “airside” at Oxford Airport. Information collected from the ground investigation will be used in the design of new pavement and apron areas. The scope of works have comprised Blacktop/Concrete Coring, Insitu CBR Testing, and DCP CBR Testing.
Gatwick Airport
Southern Testing have completed numerous phases of ground investigation to provide information on the construction thickness and underlying soil conditions of existing apron areas, “airside” at Gatwick Airport. The scope of works generally comprised Coring, Insitu CBR Testing, DCP CBR Testing and factual reporting.